Seismic-II zone compliant RCC framed structure
- Internal walls: Smooth cement plastered with lime rendering.
- External walls: Cement plastered with sponge finish.
- Internal walls & ceiling: Acrylic emulsion paint with roller finish
- External walls: Exterior grade emulsion paint on texture surface.
- Staircase flooring in marble.
- Staircase handrail in S.S.
- Main door: Engineered door frame with threshold having contemporary engineered flush shutter
- Other doors: Engineered door frames with laminate-dressed engineered flush shutters.
- Maid's room & maid’s toilet door: Painted flush shutter/aluminum frame shutter.
- Door hardware: SS brush finish with Mortise lock.
- Main door lock: Level 3 security Biometric door locks
- Balcony railings: Toughened glass for safety
- Windows: UPVC/ Aluminum sliding windows with mosquito mesh shutter.
- Maid’s room window: Aluminum window
- Living/Dining/Kitchen: Imported marble
- Second floor master suite: Wooden finish tile flooring/ laminated wooden flooring.
- Balconies: Wood-finish tile flooring.
- Terraces: Outdoor finish tiles.
- Utility: Matt finished ceramic/vitrified tiles.
- Maid’s room: Tile flooring, with ceramic tiles in toilet
- Vitrified tile dado & flooring in master toilets
- Ceramic glazed tile dado for wall up to the false-ceiling level in other toilets.
- Soft close water closet of Roca/Kohler/Duravit/Toto or equivalent
- Concealed cistern of Grohe /Kohler/ Gebrit in all toilets
- Counter type/wall mounted wash basin(white) of Roca/ Kohler/ Duravit/Toto with basin mixer in all bathrooms.
- Hot and cold mixer of Jaguar/Grohe/Kohler or equivalent makes in all bathrooms.
- Rain Shower in the master toilet
- Health faucet provided in all toilets.
- False ceiling in toilets.
- Maid's toilet fixtures
- 200 ltr. solar water heaters shall be provided and connected to all toilets.
- Exhaust fan in all toilets
- Fire retardant electric wires of Havells/Lap/Finolex/RR/KEI or equivalent.
- T.V and Telephone point in the living room and all bedrooms
- Elegant designer modular switches of GM/Norisys/Abb/ Crabtree or equivalent.
- Split AC power point in living room, dining room and all bedrooms.
- Power supply: 4BHK-12 KW
- Power Backup: 100% lighting load for villas (including refrigerator).
- 100% DG backup for lifts, pumps & common area lighting.
- Intercom facility from security to each house.
- CCTV cameras at security.
- Colour video door phone at the main door.
- No granite platform shall be provided in the kitchen/utility
- No tile dado in the kitchen.
- Provision for water purifier, instant geyser & exhaust fan.
- Provision for hob & chimney in kitchen.
- Provision for refrigerator in kitchen.
- Provision for washing machine & dishwasher
- SS sink with drain board in utility
- All internal concealed plumbing lines will be pressure tested.
- All water supply lines are of CPVC/UPVC of reputed make.
- All sanitary lines are of SWR grade PVC pipes